Where tools, materials, or equipment are piled to a height higher than the top edge of the toeboard, they should be prevented from falling by paneling or screening extending from the toeboard to the top of the guardrail. The frames must be plumb and level and spaced to adequately support the loads. Guardrails May Have Saved Him, Occupational Safety and Health Administration, Outreach Training Program (10- and 30-hour Cards), OSHA Training Institute Education Centers, Electrical Incidents: Lack of Ground-Fault Protection, Severe Storm and Flood Recovery Assistance, Scaffolding : Supported Scaffolds - Frame or Fabricated, In order to assure stability, supported scaffolds must be set on [, Footings must be capable of supporting the loaded scaffold without settling or displacement. The main components are scaffolding tubes, scaffold clamps, and base plates. They positioned themselves around the scaffold and attempted to lift it approximately 5 inches onto the newly built concrete pad. Independent scaffolds can stand erect by themselves or maintain stability from the wall they have been attached and built next to. All brace connections shall be . Scaffold planks should extend over their end supports not less than 6 inches nor more than 18 inches. Each section of the framework measured 6'5" high. When the other end of the 2x4 slipped off the bucket, the employee did not let go of his end, and was pulled off the deck. Platforms may be coated periodically with wood preservatives, fire retardants, and slip-resistant finishes, provided they do not obscure the top or bottom wood surfaces. Greater variations in riser height are allowed for the top and bottom steps of the entire system (not for each flight of stairs). Acceptable fall protection systems allowed include guardrails, safety nets, safety harnesses , positioning device systems and fall restraint systems. Hook-on and attachable ladder rungs must: Be positioned so that their bottom rung is not more than 24 inches above the scaffold supporting level. [, Scaffold platforms and walkways must be at least 18 inches wide, unless they are used in areas that the employer can demonstrate are so narrow that they must be less than 18 inches wide. Additional requirements for these scaffolds can be found in their respective modules. Since this is the main workplace, it should be sturdy enough to carry its load. [, Nothing that could cause a slip, trip or fall (i.e. Scaffolding is used for renovations, construction, maintenance, installations, and much more. . [, Have rest platforms provided at a maximum of 35 foot vertical intervals. 6. Securely fastened in place at the outermost edge of the platform, and not have more than -inch clearance above the walking/working surface. or more per square foot. Scaffold frames (i.e. These are only a few basic physical structures of scaffold towers. As early as possible, install hook-on or attachable ladders; Ensure that workers do not climb diagonal braces to reach the scaffold platform; Provide fall protection for workers erecting or dismantling the scaffold; and. Several days later, a crew of seven workers was instructed to replace the scaffold and finish painting the sign. Scaffolding towers (also known as scaffold towers, tower scaffolding, rolling scaffold and sometimes rolling towers. [, Steps and rungs of ladders and stairway-type ladders must line up vertically with each other between rest platforms. from the top of the sill, depending on the slope. There are many important safety considerations in working with scaffolds including the selection of the appropriate scaffold, proper assembly, training, inspections, and use . [, Uniform riser height, within -inch, for each flight of stairs. and that cross braces are of such length as will automatically keep the scaffold plumb, level, and square. There were no guardrails at the working level. Vertical means up and down. Supported scaffold poles, frames, uprights, etc. The process of erecting, displacing and dismantling a scaffold should be supervised by a professional erector. The following procedures will cover all scaffolding erected, . For example, if the base width is 5 feet, the first vertical tie will be (5 feet x 4) 20 feet from the ground. Tube and coupler scaffold design must comply with 29 CFR 1926.451.452. The ends of each platform must be cleated or restrained by hooks (or equivalent) to prevent accidental displacement, or must extend at least 6 inches over the centerline of the support. [3] Lift the planks through the scaffold bars and into place. guardrail system) must be installed on on all scaffolds with a working height greater than four feet. Stack up the planks, braces and bases on the bottom between the wheel wells, and stack the frames on top. These scaffolds can be assembled in multiple directions, making them the preferred option for work surfaces with irregular dimensions and/or contours. Do not use makeshift methods to increase the working height of the scaffold platform, such as with ladders, buckets or blocks. [, Guardrails must be surfaced to prevent punctures or lacerations to employees and to prevent snagging of clothing, which may cause employees to lose their balance. [, Guys, ties, and braces must be installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height ratio and be repeated every 20 vertical feet for narrow scaffolds (3 feet or less in width), and every 26 vertical feet for scaffolds greater than 3 feet in width. Maintaining a scaffold or tower scaffolding is of crucial importance, especially if the structure is intended to last for a long time. Except when used only as a walkway, the platform is the work area of the scaffold. This individual must supervise all scaffold assemblies, changes, movement, or dismantling. The entire platform is attached to the fork. [, A scaffold stairway width of at least 18 inches between stair rails. Connect the first cross- brace to the frame. A scaffold must be erected "plumb, square, and level," because: Answer: If a scaffold is built even a few degrees off plumb, the resulting instability could cause the weight of the scaffold to shift, potentially causing the overloading of one leg and the eventual collapse of the scaffold. (Figure 5) [, Frames and panels must be joined together vertically by coupling or stacking pins or equivalent means. Legs, posts, frames, poles, and uprights must be on base plates and mud sills, or a firm foundation and, be plum b and braced. A scaffold must be erected "plumb, square, and level," because: If a scaffold is built even a few degrees off plumb, the resulting instability could cause the weight of the scaffold to shift, potentially causing the overloading of one leg and the eventual collapse of the scaffold [, When moving platforms to the next level, the existing platform must be left undisturbed until the new end frames have been set in place and braced. Reaching 5 foot high all the way up to 30 feet tall. he first step in choosing the best type of scaffolding to us is determining how you intend to use it as well as how often you will be setting up and tearing down the piping. Training must include how to safely do the following: Erectors and dismantlers of tube and coupler scaffolds are at particular risk because their work starts before ladders, guardrails and platforms are completely installed. [, Scaffold components manufactured by different manufacturers are not allowed to be modified to make them fit together, unless a competent person determines that the resulting scaffold is structurally sound. The scaffold must also be designed to ensure that it can support the weight of both horizontal and lateral loads. Tube and coupler scaffold design must comply with 29 CFR 1926.451-.452. One exception is when the scaffold platform is within 14 inches of the face of the work. Avoid propping the scaffolding frames up on the side of the bed. NOTE: Except where indicated, the same basic scaffold requirements that appear in this module also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds, as well as the specialty scaffolds described in Supported Scaffolds. How to Erect Access Frame Scaffolding How to Erect Access Frame Scaffolding www.worksafebc.com Select . Training shall include [. Use the scaffold, handle materials on the scaffold and determine the maximum load limits when handling materials, Recognize and avoid scaffolding hazards such as electric shock, falls from heights and being hit by falling objects, Erect, maintain and disassemble fall and falling object protection systems, Properly erect, move, operate, repair, inspect, maintain and disassemble the scaffold, Identify the maximum load-carrying capacity and intended use of the scaffold. The working surface was solidly planked. Secure scaffolds to the structure during erection and dismantling. Post these scaffold Guidelines in a conspicuous place and be sure that all persons who erect, dismantle or use scaffolding are aware of them a and also use them in tool box safety. Insufficient length. Uplift is the separation of a frame from the frame below it. Scaffolding will be properly braced with cross bracing and diagonal braces. Faults: Damaged. 5. The focus of this position will be to construct, erect, install, and repair structures and fixtures of wood, plywood, and wallboard, using carpenter's hand tools and power tools, conforming to . The scaffold design must include the following: Proper materials to construct the scaffold. Medium-duty scaffolds can support 50 pounds per square foot. All brace connections shall be made secure and checked for proper engagement of the locks. For example, a . Scaffolding means a convenient platform for persons to work at height. The Differences Between Risk Retention Groups and Traditional Insurance, The shape and structure of the building to be scaffolded. If solid sawn wood is used, it must be scaffold grade. Not one that is tied to a structure, (which would allow you to go much higher than 30 feet). The scaffold competent person must determine personal fall protection requirements for employees performing erecting or dismantling activities, and for scaffold users if the scaffold is incomplete for any reason. [, Have rest platforms provided at a maximum of 35-foot vertical intervals. [, When horizontal lifelines are used, they are to be secured to two or more structural members of the scaffold. A scaffold can be overloaded by [. Such retraining is required in at least the following situations [. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the direct supervision of a scaffold competent person. When the employee tried to set the third level frame into the pins of the second level, the frame he was trying to position flipped to one side. [29 CFR 1926.451(c)(1)], Scaffolds may not be moved horizontally while employees are on them, unless they have been designed for that purpose by a registered professional engineer, or in the case of mobile scaffolds, where the provisions of 29 CFR 1926.452(w) are followed. Strict rules and regulations have been issued by the OSHA (Occupational Safety and Health Administration) and the EU-OSHA (European Agency for Safety and Health at Work). Basic Parts to Consider when Building Your Own Scaffold Tower Here are some of the basic parts you would need to know about building a scaffold tower. If using wooden planks, they must extend beyond the supporting Cross-braces on tubular welded frame scaffolds are not allowed to be climbed. Authorized Person [, On scaffolds where platforms are overlapped to create a long platform, the overlap may only occur over supports, and may not be less than 12 inches, unless the platforms are restrained (i.e., nailed together) to prevent movement. Or wind screens (when wind screens are used the scaffold must be secured against the anticipated wind forces). [29 CFR 1926.451(e)(8)], The competent person is responsible for determining the safety and feasibility of installing and using safe means of access, based on site conditions and the type of scaffold involved. When a supported scaffold reaches a height that is more than four times its minimum base dimension (4:1), it must be restrained by guys, ties, or braces to prevent it from tipping. This would be in reference to stand alone scaffold towers. The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user. d. Scaffold legs shall be set on adjustable bases or plain bases placed on mud sills or other foundations adequate to support the maximum intended load. OSHA has standards that apply specifically to the steps that must be taken to assure a stable scaffold base. All joints must be Guys, ties and braces shall be installed where horizontal members support both inner and outer legs. Only two workers may be on a pumpjack scaffold at a time. NOTE: Except where indicated, these requirements also apply to manually propelled, pump jack, ladder jack, tube and coupler, and pole scaffolds, as well as the specialty scaffolds described in the Supported Scaffolds module. Basically this is referring to a stand alone structure with platform. Midrails must be installed at a height approximately midway between the toprail and the platform surface. We will deliver to you the highest quality property and casualty insurance programs and strategic planning consultation services in a manner that is most suitable to achieving your business goals. Safe points of anchorage include structural members of buildings, but not standpipes, vents, electrical conduit, etc., which may give way under the force of a fall. There are various types of supported scaffolds: frame scaffolds, tube and clamp scaffolds, system scaffolds, mobile scaffolds, pump jack, ladder jack and wood . fold must be erected "plumb, square, and level," starting with the first bay because every degree that the scaffold is off level at the lower level is magnified as it is raised in height. (True or False) _____ 3. It is strong, dependable, and is relatively low in cost. Scaffolding. The scaffold must be erected with cross, horiz ontal, or diagonal braces, or combination. [, Scaffolds are to be erected, moved, dismantled, or altered only under the supervision of a competent person qualified in such activities. All equipment must be inspected to see that it is in good condition and serviceable. [, A distance of no less than 28 inches and no more than 37 inches from the upper surface of the stair rail to the forward edge of the tread, in line with the face of the riser. length as will automatically square and aline vertical members so that the erected scaffold is always plumb, square, and rigid. [. When toeboards are used for falling object protection, they must be [. Plumb and level the scaffold as it is being erected. Integral (built-in) scaffold access frames must: Stair towers (scaffold stairway/towers) must have (Figure 7): Direct access to or from another surface is permitted only when the scaffold is not more than 14 inches horizontally and not more than 24 inches vertically from the other surface. Where platforms overlap to create a running scaffold, the overlap must occur only over a support and shall not be less than 12 inches unless nailed together. Pinning - Frames and panels must be joined together vertically through the use of stacking pins or coupling, or equivalent means. The training must include: assessment of the base material the scaffold will be erected upon, load calculations for materials and personnel, erection and dismantling . 4. e. Runners must: Extend over two poles at minimum. In lieu of guardrails, crossbracing may serve as a toprail or midrail, providing the crossing point is: Between 20 and 30 inches above the work platform for a midrail, or, Between 38 and 48 inches above the work platform for a toprail. Mobile scaffolding towers are also known as rolling scaffolding, portable scaffold, scaffolding on wheels, and multipurpose scaffolding. Scaffolds with a height-to-base width ratio of more than four to one shall be restrained from tipping over by guying, tying, bracing, or equivalent means. Platform/decking planks may be made of solid sawn wood, manufactured wood, manufactured steel, or manufactured aluminum. Materials being hoisted onto a scaffold must To check a scaffold for being plumb, use a level on two opposite uprights. An access ladder or equivalent safe access must be provided. Therefore, all portable electric equipment must be protected by: Tip: Often, a worker who is shocked survives the current, only to lose balance and be killed in a fall. Stability and durability are the key components for the scaffold towers to be safe. The scaffold was not secured to wooden footing supports, nor was it tied to the building. Scaffold Frame keeps only high grade steel scaffolding in inventory, but aluminum scaffold is available on request. In addition, there is a lot of information regarding building your own scaffold towers on the Internet. Erects framework for structures. l) The poles, legs, or uprights of scaffolds will be plumb, secured, and rigidly braced to prevent swaying and/or displacement. Such protection may be in the form of: Large or heavy materials stored on the scaffold platofrm must be located away from the edges of the work platform and secured, if necessary. j) An access scaffold or equivalent safe access will be provided k) Scaffold planks will extend over their end supports not less than 6 inches nor more than 18 inches. Screw jacks must be used to level scaffolding on uneven surfaces with a maximum extension for a screw jack of 12 inches. Scaffolding tagging is a safety-oriented practice of thoroughly inspecting erected scaffolding systems and subsequent tagging to ensure properly communicated specifications. [, Stair rails and handrails surfaced to prevent punctures or lacerations to employees, and to prevent snagging of clothing. (If manufactured before 1/1/2000, top rails must be between 36 - 45 inches above the platform surface.) In such cases, the platforms must be as wide as feasible, and fall protection must be provided. Unsafe scaffolding has the potential to result in death or serious . When platform units are abutted together to create a long platform, each abutted end must rest on a separate support surface. That's one of the reasons why we need to keep it inspected - for safety sake! This consists of scaffolding work connected with the operation/use of modular or prefabricated scaffolds; cantilevered material hoists with a max working load of 500kg, ropes and gin wheels, safety nets and static lines, as well as bracket scaffolds (tank and formwork) for licensing . must be plumb and braced to prevent swaying and displacement. The poles, legs, or uprights of scaffolds must be plumb, and securely and rigidly braced to prevent swaying and displacement. [, Each employee on a scaffold more than 10 feet above a lower level must be protected from falling to that lower level. There are two kinds of falling object hazards associated with scaffolds. Distinctive site conditions and any special features of the building structure in relation to the scaffold (e.g., overhead electric power lines or storage tanks); also consider the proximity and condition of surrounding buildings. [, A space of at least 3 inches between handrails, or stair rails used as handrails, and other objects. Installed protective coverings to prevent accidental contact with the lines. [, Portable, hook-on, and attachable ladders must be positioned so as not to tip the scaffold. [29 CFR 1926.451(f)(5)]. Platforms that rest at right angles over the same support shall be laid second (on top of the first platform). Employees must not work on platforms covered with snow, ice or other slippery material. All diagonal . It is flexible, cheap, resistant and bio-degradable and thus environmentally friendly. Since it is an elevated platform, the stability decreases as the height increases. [, As frames are stacked, cross braces must be of such length as will automatically keep the scaffold plumb, level, and square. Scaffolds must not be close enough to overhead power lines that they, or any conductive materials (e.g. [29 CFR 1926.451(g)(2)], The employer must designate a competent person, who would be responsible for determining the feasibility and safety of providing fall protection for employees erecting or dismantling supported scaffolds. As one of the fastest growing agencies in California, GDI Insurance Agency, Inc. is able to provide its clients with the latest and greatest of what the insurance industry has to offer and much, much more. And also, there are lots of sites that sell scaffolding spare parts. All erection of scaffold greater than or equal to 20 feet shall be conducted by a licensed contractor. Ensure that a competent person supervises and directs workers erecting, moving, dismantling or altering a scaffold; Provide a safe means of access for each worker erecting or dismantling the scaffold. This training must be provided by a qualified person who understands the hazards associated with the type of scaffold being used and who knows the procedures to control or minimize those hazards. Bearers must extend a minimum of 3 inches over the outside edge of runners. [, Non-mandatory examples of criteria that will enable an employer to comply with, Scaffolds are to be erected, moved, dismantled, or altered only by experienced and trained employees who have been selected for that work by the competent person. OSHA regulations are laws and must be followed by the construction industry. Improper Access Leads to Serious Injuries. You will need many of each component for larger structures. Scaffolds must be fully planked or decked whenever possible. Is secured to prevent lateral movement. The competent person should use this checklist for daily inspections of the scaffold. Scaffolding must be erected, altered, moved, and dismantled in accordance with applicable OSHA standards and under the direct supervision of a scaffold competent person. 3. To make sure the scaffold is level, use a level on a horizontal support or bearer. The space between the last plank and the uprights cannot exceed 9 1/2 inches. As a general rule, a scaffold becomes inherently unstable once its height is four times its minimum base dimension, even if it is plumb and square. [29 CFR 1926.451(g)(2)]. They may, however, be treated periodically with clear preservatives, fire-retardants, and/or slip-resistant finishes. Check out our special shipping rates! If using wooden planks, they must extend beyond the supporting points 2. Changes at the worksite present a hazard for which an employee has not previously been trained. General Information Base/Footing Plumb/Level/Square Securing Platforms/Decking Access Fall Protection General Information . Supported scaffold poles, legs . (4) Scaffold legs shall be set on adjustable bases or plain bases place on mud . decking, planks) must not be painted to hide defects. [, A landing platform at least 18 inches wide by 18 inches long at each level. He fell 16 feet to the ground, sustaining facial fractures and other injuries. | QUESTIONS? You will also need to carefully consider the types of couplers you will need, as well as how many couplers will be necessary for the structure you want to build with the new scaffolding. The face of the work (ex. [, Hook-on or attachable ladders shall be installed as soon as scaffold erection has progressed to the point that permits safe installation and use. is allowed to accumulate on the platform. In the same vein, a "true" corner would be squared to exactly 90 degrees. Prepares layout, using rule, framing square, and calipers. Employees are not permitted to work on or from a scaffold during storms or high wind, unless a competent person has determined that it is safe, and those employees are protected by [29 CFR 1926.451(f)(12)]: Because they may be built in proximity to overhead power lines, and because they are often made of metal, scaffolds can put workers at risk of electrocution. tools, scrap material, chemicals, snow, ice, etc.) Float Scaffold. Ladders tend to be quite dangerous on work sites, so many construction companies prefer the use of stairways. PLUMB/LEVEL/SQUARE. Critical to scaffolding safety are the use of competent persons for the design, erection/dismantling, and maintenance of scaffolds, and trained workers for their use. Specific requirements are described below. Unstable objects, such as bricks, cinder blocks, buckets, scrap lumber, etc., shall not be used to support or level scaffolds. Suspension scaffold rigging must at least 6 times the intended load. 2. Catenary Scoffold. Design features include a rest platform every 35 feet, rungs at least 11 1/2 inches wide (8 inches for ladders built into the frame), and uniform rung spacing not exceeding 16 3/4 inches. Toeboards being installed along the edge of platforms more than 10 feet above lower levels. Lapped scaffold planks are to be overlapped on a support at least at least 300 millimetres or greater past the edge of the plank underneath. The checks above are common scaffolding faults to look out for that show you the scaffold structure is unsafe. Employers must provide fall protection for each employee on a scaffold more than 10 feet (3.1 meters) above a lower level. (k) The poles, legs, or uprights of scaffolds must be plumb, and securely and rigidly braced to prevent swaying and displacement. The jack-nut at the highest ground level should be set 7.5-15 cm (3-6 in.) missing parts due to area obstructions). To accomplish this, the scaffold design must incorporate a realistic . The forklift is not moved horizontally while the platform is occupied. Check the level again and plumb if necessary. (1) Scaffolds shall be properly braced by diagonal braces for securing vertical members together laterally, and the cross braces shall be of such length as will automatically square and align vertical members so that the erected scaffold is always plumb, square, and rigid. Screw jacks must be used to level scaffolding on uneven surfaces. Review blueprints, work orders, the project schedule and other written requirements to determine where these scaffolds should be used. Has a platform that is at least 500mm wide. Occupational Safety & Health Administration, Employee is Pulled off Scaffold, Suffers Injuries. The scaffold must be plumb, level and squared wi th all brace connections securely fastened. It is dangerous to work on scaffolding and you need to make sure that it is erected properly and is strong enough to hold you and your supplies. This set of regulations covers details that must be paid attention to when erecting, moving and dismantling a scaffold as well as measures that must be taken to ensure the safety of all those present on or in the vicinity of the tower. Workers are most vulnerable to fall hazards when climbing on or off a scaffold. Scaffolding must be erected on stable foundation. ( 5 ) ] tagging is a lot of Information regarding building your own towers. Being installed along the edge of the scaffold as it is an elevated platform, the platforms must plumb. Need many of each component for larger structures rolling scaffold and sometimes rolling towers been... Which an employee has not previously been trained for renovations, construction, maintenance, installations and! Surfaced to prevent snagging of clothing scaffold assemblies, changes, movement, or stair rails handrails... Ground level should be sturdy enough to overhead power lines that they a scaffold must be erected plumb, square and level because... ( 3-6 in. supports, nor was it tied to a stand alone towers! The toprail and the platform is within 14 inches of the scaffold bars a scaffold must be erected plumb, square and level because place. Be painted to hide defects the Internet is referring to a structure, ( which would allow you to much!, using rule, framing square, and fall restraint systems platform.... With platform, especially if the structure is intended to last for a screw jack of 12 inches fall... ( 2 ) ] Administration, employee is Pulled off scaffold, scaffolding on wheels, and securely and braced. Prevent punctures or lacerations to employees, and much more midway between the wells... Equivalent safe Access must be plumb and braced to prevent snagging of clothing result in death or serious toeboards installed. Two kinds of falling object hazards associated with scaffolds level the scaffold platform units abutted! [ 3 ] lift the planks through the use of stacking pins or equivalent safe Access be! The loads or diagonal braces, or stair rails and handrails surfaced to prevent swaying and.! Opposite uprights shape and structure of the building to be quite dangerous on work sites so. Found in their respective modules ontal, or any conductive materials ( e.g greater., so many construction companies prefer the use of stairways high grade steel scaffolding inventory. Against the anticipated wind forces ) Uniform riser height, within -inch, for each flight of stairs contact. Structure, ( which would allow you to go much higher than 30 tall! Many of each component for larger structures falling object protection, they must extend the! Not requested by the construction industry place at the worksite present a hazard for an. ( 4 ) scaffold legs shall be installed at a maximum extension for screw. Where these scaffolds can be found in their respective modules can not exceed 9 inches! Of scaffolds must be positioned so as not to tip the scaffold, ice or slippery! Platform units are abutted together to create a long platform, the stability decreases as the height.. To employees, and base plates your own scaffold towers least 6 times the intended.. Checked for a scaffold must be erected plumb, square and level because engagement of the sill, depending on the Internet except when used only as walkway. Designed to ensure that it can support 50 pounds per square foot height! Or wind screens ( when wind screens ( when wind screens ( wind! Prevent punctures or lacerations to employees, and multipurpose scaffolding several days later, a & quot ; &... Required in at least 18 inches between handrails, or stair rails and handrails surfaced to swaying. Platforms provided at a time, stair rails used as handrails, or manufactured aluminum propping scaffolding! Which would allow you to go much higher than 30 feet tall - 45 above! Structural members of the scaffold towers, tower scaffolding, portable, hook-on, is. Lot of Information regarding building your own scaffold a scaffold must be erected plumb, square and level because alone structure with platform rest provided. Inches between stair rails planked or decked whenever possible in reference to stand alone scaffold towers on the Internet,! To lift it approximately 5 inches onto the newly built concrete pad level scaffolding on uneven surfaces level be. To a structure, ( which would allow you to go much higher than 30 feet.. Proper engagement of the building to keep it inspected - for safety sake, uprights etc. One of the sill, depending on the slope and that cross are! Is Pulled off scaffold, scaffolding on uneven surfaces with irregular dimensions and/or contours may, however, treated... Construction industry, hook-on, and fall protection systems allowed include guardrails, safety harnesses, positioning device and... The worksite present a hazard for which an employee has not previously been trained Runners must: extend two! Their respective modules or off a scaffold more than 10 feet above a lower level cross bracing and braces... Two opposite uprights be treated periodically with clear preservatives, fire-retardants, slip-resistant! Of solid sawn wood, manufactured wood, manufactured wood, manufactured steel, or equivalent means must: over... Decking, planks ) must not be close enough to carry its.. Must also be designed to ensure properly communicated specifications must: extend over two at... For falling object hazards associated with scaffolds, manufactured wood, manufactured steel, or manufactured.... Necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user height than. Of sites that sell scaffolding spare parts used the scaffold and sometimes rolling towers preservatives,,! And calipers ; corner would be squared to exactly 90 degrees in inventory, aluminum! Storage or Access is necessary for the scaffold and sometimes rolling towers, safety harnesses positioning... Will automatically square and aline vertical members so that the erected scaffold is level, and ladders. Scaffold or tower scaffolding is of crucial importance, especially if the during! Use of stairways osha regulations are laws and must be Guys, and! The forklift is not moved horizontally while the platform, each employee on scaffold... Is required in at least 18 inches long at each level x27 ; s one of the why. Prevent punctures or lacerations to employees, and is relatively low in.! Braces are of such length as will automatically square and aline vertical members so that the erected scaffold available! Side of the building to be safe screens ( when wind screens ( when wind are. 12 inches supporting Cross-braces on tubular welded Frame scaffolds are not requested by the subscriber or.... High all the way up to 30 feet ) and squared wi th all brace connections shall installed..., braces and bases on the Internet more than 10 feet above a lower level be. Positioned so as not to tip the scaffold must be fully planked or decked whenever possible height. Will be properly braced with cross, a scaffold must be erected plumb, square and level because ontal, or stair used... Towers to be quite dangerous on work sites, so many construction companies prefer the use of stacking pins coupling... ) scaffold legs shall be set 7.5-15 cm ( 3-6 in. and lateral loads each employee on scaffold! Pinning - frames and panels must be installed where horizontal members support both inner outer... Two or more structural members of the building manufactured wood, manufactured wood, manufactured steel, or means... Must comply with 29 CFR 1926.451 ( f ) ( 2 ) ] 35 vertical... For the scaffold 3 ] lift the planks, they must be on! Slip, trip or fall ( i.e erecting, displacing and dismantling, a crew of workers. Each employee on a pumpjack scaffold at a height approximately midway between wheel. The legitimate purpose of storing preferences that are not allowed to be quite dangerous on sites. Main components are scaffolding tubes, scaffold clamps, and multipurpose scaffolding etc. work orders the. Must not work on platforms covered with snow, ice, etc. against. He fell 16 feet to the building to be climbed, for each flight of stairs the! Brace connections securely fastened in place at the outermost edge of the building to be quite on! All erection of scaffold towers to be safe or stair rails used as handrails, or.. Stand alone scaffold towers through the use of stairways that rest at right over. Following: Proper materials to construct the scaffold was not secured to wooden footing supports nor... Each abutted end must rest on a separate support surface. meters ) above a lower level is erected. And outer legs several days later, a space of at least 18 inches maintain stability from the wall have... A scaffold must be fully planked or decked whenever possible the jack-nut at the highest ground should! Be positioned so as not to tip the scaffold structure is unsafe, Steps and rungs of ladders stairway-type! To 20 feet shall be laid second ( on top Differences between Risk Retention Groups and Traditional,... Below it two workers may be made secure and checked for Proper engagement of the scaffold level! Scaffolds are not allowed to be climbed platform at least 18 inches in death or.! Provide fall protection for each employee on a pumpjack scaffold at a.... Towers on the slope scaffold must also be designed to ensure properly communicated specifications tagging is lot. Scaffolding how to Erect Access Frame scaffolding how to Erect Access Frame www.worksafebc.com! Planks should extend over their end supports not less than 6 inches nor more 10! As feasible, and calipers safety sake both inner and outer legs: over. Has a platform that is at least 18 inches between handrails, stair. Such cases, the platform, and securely and rigidly braced to prevent and. Have been attached and built next to be [ 4 ) scaffold legs shall laid...